JFM is a family of qualified carpenters working across Geelong, the Surf Coast, the Bellarine and Golden Plains. Decks, pergolas, fences, doors, windows, weatherboards, heritage work and the trade side of renovations, plus the built-ins, floors, framing and trims in between. One team does the carpentry and finishes the job.

The first two have their own pages. The rest is the everyday carpentry that holds a house together.
Decks, pergolas and verandahs, fences and gates, weatherboards and cladding, fascias, and ramps and handrails. Each one has its own page, linked below.
Doors hung and repaired, sash windows restored, windows replaced, and walls opened up or closed in.
Study desks in solid timber, floating shelves, wardrobes and linen cupboards, and shelving built into old openings.
Timber floors laid, VJ and lining boards, skirtings, architraves and cornices, matched to what is already there.
Walls framed for new layouts, sheds turned into studios and music rooms, and frames for extensions and outdoor rooms.



Decking, deck repairs, pergolas and verandahs.
Fencing, fence repairs and gates.
Door repairs, door installation, window repairs and window replacement.
Weatherboard repairs, weatherboard replacement and cladding.
Home maintenance, fascia replacement and home modifications.

A call, an email or a photo. Small or large.
On site, so the quote is for what is really there.
Carpentry, materials and any finishing, set out in full.
By the same team from the first cut to the clean-up.
A messmate desk made to fit the space with two cable holes, and a floating messmate shelf to match. 2020.
The old wall oven taken out and the opening turned into four or five shelves with a back wall and the power point brought through. 2021.
A pantry cut back to make room for a walk-in linen with L-shaped shelving, then a floating floor laid to match the timber floor and a fourth shelf added. 2026.
New Tassie oak boards in two living rooms, the kitchen and the mud room, with the skirtings and architraves replaced. 2023.
Walls battened, insulated and plastered, sliding doors fitted, carpet tiles laid and the room painted. 2022.
An outdoor room and deck built to plans, about 650 metres of decking boards, with a back wall in cement sheet and shadow clad. 2020.
They repaired and rebuilt all the pieces within 3 weeks to a high class. Communication as well was never an issue and Michael always kept us in the loop. These guys are going on speed dial for the future.
Every town we work in has its own page with the jobs we have done there. Pick yours.
Tell us about it and we will give you a straight answer and a free estimate.

