Doors that bind, frames that have rotted, cracked cladding, broken seating and water damage on commercial buildings. We repair the thing that has failed, match it to what is there, and leave it painted and working, with make-safe work done first when it can’t wait.

These are the one-off repairs commercial clients call us for most.
Binding and swollen doors, rotted frames, failed panic bars and closers, and stainless steel doors replaced in wet and corrosive plant rooms.
Cracked cement sheet, damaged render and broken panels replaced and painted to match the wall around them.
Rotted joists, loose planks and failed seat tops repaired or rebuilt in timber that suits the weather.
Mouldy plaster, ceilings and trims replaced, water-damaged doors swapped out, and the leak traced so it doesn’t happen again.
Rotted fascia and eave sheets replaced, timber behind them strengthened, and gutters cleaned and refitted.



Doors near the coast and in plant rooms rust and swell. Stainless steel doors, rain hoods and drop seals hold up where timber and painted steel don’t.
Doors that open hundreds of times a day wear out hinges, closers and latches. We fit hardware rated for the traffic.
Outdoor seating and joinery rot from the joists up. We replace the frame in treated pine and refit the tops.
Water behind sheeting and above ceilings does damage before it shows. We open it up and find the source.
Of the damage, with the site and a contact.
If it can’t wait, we make it safe first.
For the repair, against your purchase order.
Fixed, finished to match, and the site cleaned up.
Two binding doors to a filter room replaced with stainless steel doors, the handles, drop bolts and closer reused, with new hinges and drop seals. 2022.
An old stainless steel door replaced with a new one, new mortice and handles, and a rain hood fitted over it. 2026.
A fire door replaced like for like and painted, with the existing hardware refitted. 2026.
Mouldy plaster and window trims replaced, two outside doors swapped for new slab doors with the old lock reused, a hood fitted, and the doors painted. 2025.
The gutter taken down, rotted fascia and a broken eave sheet replaced, the rotted joists behind laminated with new timber, and the gutter refitted with gutter guard. 2025.
A failing panic bar replaced with a top and bottom pin latching system, and a seal added to the door. 2026.
A failed aluminium door and window replaced with a timber frame, a painted slab door that swings out, a new window, a rain hood and a drop seal. 2022.
A repair often leads to one of these.
We repair commercial buildings across Geelong, the Surf Coast, the Bellarine and Golden Plains. Pick a town to see the work we do there.
Send us a photo and the site details, and we will give you a straight answer and a free estimate.

