Renovating a kitchen, bathroom, laundry or a whole room and need the trades to pull it together? We do the carpentry ourselves and coordinate the plasterer, electrician, plumber, tiler and painter, so the trade side runs as one team and finishes complete. You bring the design and the fittings; we bring the trades and the finish.

We run the trade side, not the design. You choose the layout and the fittings, and we make it come together.
Walls framed or taken out, floors levelled and laid, doors and joinery fitted, with the plasterer, electrician and plumber coordinated around the carpentry.
Old kitchens out, cabinetry and joinery installed, bulkheads, cornices and splashbacks done, with the plumber, electrician and tiler coordinated, so the trade side is one job.
Stripped back to the frame, rotten timber replaced, floors sheeted, and the waterproofing, tiling and plumbing coordinated, so the room comes back together complete.
Cabinetry, stacked machines, benches and storage fitted, tiled and painted, often in the same job as the kitchen or bathroom.



Old showers leak into the frame and floor for years before anyone sees it. We replace the timber and sheet the floor before anything new goes down.
We treat it, find where the water came from, and fix that before the wall is closed.
Old floors dip and slope. We level what we can before tile underlay or new flooring goes down.
A pantry too big, a linen too small, or a wall between the kitchen and family room. We reframe the layout to suit how you live.


Your drawings, a 3D plan, or the room and what you want from it.
The room, the walls, the floor and the order the trades go in.
Carpentry, trades and finishing set out, with your fittings allowed for.
Carpentry first, the trades in order, and the room handed back finished.
A new kitchen on the oven wall to a 3D plan with a glass splashback and a stone-topped island, and the pantry cut back to make a walk-in linen. 2026.
The old kitchen and the dividing wall taken out, plumbing and electrical roughed in, the new kitchen and cornice installed, the floor tiled and the room painted. 2023.
Overhead cupboards and benchtops replaced, end panels fitted for the dishwasher, new plank flooring and a tiled splashback. 2025.
A bathroom laid out from 3D plans to fit a bath, a walk-in shower and a double vanity. 2024.
Scyon flooring, the floor and skirting tiled, a niche built in, a bath and taps fitted, and a glass screen and new shower head in the ensuite. 2022.
A full bathroom renovation with a stone benchtop and side panels, and the plumbing coordinated. 2022.
Rotten floor timber and the bottom plate replaced, Scyon flooring glued and nailed, and a shower tray set for the plumber. 2026.
Renovated our kitchen. Michael worked with our budget and we were so impressed by their diligence and workmanship. They didn’t cut corners but went the extra mile. So impressed with their work, we engaged them again with a 2nd job at another property. Highly recommend.
Michael did a fantastic job on my bathroom. He ran the project end to end, had very little supervision and sent me regular picture updates of the progress. I found him reliable, trustworthy and wouldn’t hesitate to recommend him.
A renovation often brings in one of these.
We do the trade side of renovations across Geelong, the Surf Coast, the Bellarine and Golden Plains. Pick your town to see everything else we do there.
Show us the plan or the room, and we will walk it with you and give you a free estimate.

